Line 5 is a proposed metro line connecting New Can Giuoc Terminal– Highway No.50 – Tung Thien Vuong – Phu Dong Thien Vuong – Ly Thuong Kiet – Hoang Van Thu – Phan Dang Luu – Bach Dang – Dien Bien Phu – Sai Gon Bridge.
Total length: 23,39 km.
Phase 1 (Bay Hien Intersection – Sai Gon Bridge)
Total length: 8.89 km (7.46 km underground and 1.43 km elevated).
Number of station: 9 stations (including 8 underground stations and 01 elevated station).
Phase 2 (Bay Hien intersection – New Can Giuoc Bus Station) and Da Phuoc depot.
Total length: 14.5 km (8.9 km underground and 5.6 km elevated).
Number of station: 13 stations (8 underground stations and 5 elevated stations).
HCMC Metro Line 5 links and resources
Management: MAUR (Management Authority For Urban Railways).
Wikipedia: Line 5, Ho Chi Minh City Metro.
HCMC Metro Line 5 maps
[Line 5 map by MAUR.]