Line 3A of the HCMC Metro is the proposed western extension of Line 1.
Phase 1 (Ben Thanh – Western Bus Terminal)
Total length: 10 km underground.
Number of station: 10 underground stations.
Phase 2 (Western Bus Terminal – Tan Kien Station) and Tan Kien Depot
Total length: 9.9 km (0.6 km underground and 9.3 km elevated).
Number of station: 7 elevated stations.
HCMC Metro Line 3A links and resources
Management: MAUR (Management Authority For Urban Railways).
Wikipedia: Line 3A, Ho Chi Minh City Metro.
HCMC Metro Line 3A maps
[Line 3A map by MAUR.]